Mpre bulkhead building today. Last time I thought "Bulkhead 3.5" was pretty well complete, but no. Today I cut out the forward companionway opening and framed it, and cut limber holes. Framing takes a while because all joins have to be cut and fitted.
Anyway after a few hours Bh 3.5 was a shot duck.
Mext I prepped the framing for "Bulkhead 10". This bulhead is 10' from the bow and fits at the aft end of rhe main cabin. And prepping the timber means that 35x70mm. DAR pine is ripped down its centre line to make 1 1/2" square timber which is required in the Plans. So already Bulkhead 10 is drafted up, needing joints to be marked off and cut before final assembly.
Anyway after a few hours Bh 3.5 was a shot duck.
Mext I prepped the framing for "Bulkhead 10". This bulhead is 10' from the bow and fits at the aft end of rhe main cabin. And prepping the timber means that 35x70mm. DAR pine is ripped down its centre line to make 1 1/2" square timber which is required in the Plans. So already Bulkhead 10 is drafted up, needing joints to be marked off and cut before final assembly.
Bow and 3.5 Bulkheads in mock lay up. |
Comments
Post a Comment